
J
A
C
打印人:20122642 部门:客户服务部
Door System Service Manual W5000-NAM-PV-CS-G9-24
3. Left front door vertical slot assembly and left- front door groove
assembly
Important process
1. LF door outside handle assembly
Place the outside handle on the installation point, making sure the hole
aims at the middle point. F irst, insert the hexagon flange bolt into the
round hole, and pre-tighten it. Then, pre-tighten the other bolt; tighten
the other two bolts in turn.
Torque (N.m) 9±2
2. Place the LF door lock and lock assembly on the installation point,
making sure the hole aims at the middle point. First, insert the M screw into
the round hole, and pre-tighten it. Then, pre-tighten the other two screws in
turn.
3. Insert the door lock lever firmly into the outside handle assembly
respectively, rotate the sleeve to tense it, and snap into the slot of the fixing
bayonet, connecting to the door inner trim panel.
4
2
3
5
1
Disassemble
Disassembly Order
1. Cross head Self-tapping screws and washers
combination.
2. Left front door outside water proof rubber trip
3. Hexagon flange nut
4. Left front door vertical slot assembly
5. Left front door groove assembly
Install
Installation order
5. Left front door groove assembly
4. Left front door vertical slot assembly
3. Hexagon flange nut
2. Left front door outside water proof rubber trip
1. Cross head Self-tapping screws and washers combination.