
J
A
C
打印人:20122642 部门:客户服务部
Service Manual
N125-NAM-PV-DP-G9-19
6 / 40
Transmission hanging assembly removal
Remove four hexagon flange locking nuts connecting
the transmission hanging assembly and remove the
transmission hanging assembly.
Re-installation
Re-installation is in the opposite direction of removal.
Fasteners re-installation torque summary
No. Description Torque values (N *
m)
Remarks
1
Hexagon bolts and hexagon flange locking nuts on both sides
of engine suspension
41~51
2
Rear suspension connecting bolts and hexagon flange locking
nuts
73~89
3
Connecting suspension beam assembly and hexagon screws of
car frame
73~89
4
Hexagon flange locking nuts connecting the transmission
hanging assembly
41~51
4. Engine suspension fault handling
(1) When removing the engine suspension device, check if there is obvious mechanical damage on each
component, must be replaced if there is any d amage.
(2) While removing or re-installation engine suspension, pay attention to prevent water, Corrosive solvents
into parts, otherwise, it will influence life of parts.
(3) If there is engine or power vibration and sounds while using vehicle, check if there are any desoldering
or rubber cracking on suspension beam assembly and transmission hanging assembly, prepare corresponding
replacement or dealing with to dismiss problem.