
J
A
C
打印人:20122642 部门:客户服务部
Maintenance Manual
N125-NAM-PV-DP-G9-17
14
/
19
5.adjusting mechanism: remove adjusting plug
screw, spring, gear fulcrum bearing, plug
cover and so on.
6.Valve assembly and accessories:screw bolt
and remove Valve assembly.
7.Limiting sleeve assembly: screw limting
sleeve assembly with auxiliary tool.
8.gear assembly: draw out gear plunger
assembly.
9.left&right pipe line assembly: remove
left&right pipe line assembly.
inspection and maintenance
If there is any wear and tear or error state after inspection, it shall need some necessary
proofread or parts replacement.
reassembly
reassembly sequence is on the contrary to disassembly sequence.
Project
Quanti
ty Tightening torque (N.m)
Steering wheel fixing nut 1 35~40
steering column mounting nut 2 18~22
steering column mounting bolt 2 18~25
connecting bolt between steering column and
under shaft 125~30
connecting bolt between under shaft and
power steering device 1 25~30
power steering device fixing bolt 4 90~110
connecting nut between steering tie rod end
and steering joint 2 50~60
oil pipe and bolt of fixing bracket 9 9~11
oiler bracket fixing bolt 3 18~22
oiler bracket fixing bolt 4 18~23
oiler bracket fixing bolt 5 18~24